Obras de bioingeniería para evitar erosión de suelo [Nicaragua]
- Creation:
- Update:
- Compiler: Wilmer Gomez
- Editor: –
- Reviewers: Johanna Jacobi, Alexandra Gavilano
Bioingeniería
technologies_4572 - Nicaragua
View sections
Expand all Collapse all1. General information
1.2 Contact details of resource persons and institutions involved in the assessment and documentation of the Technology
SLM specialist:
Rodriguez Oscar
MARENA
Nicaragua
Name of project which facilitated the documentation/ evaluation of the Technology (if relevant)
Para el mandato de backstopping para le programa gestion comunitaria de la cuenca de Rio Dipilto en Nicaragua (Gestion comunitaria - Nicaragua)Name of the institution(s) which facilitated the documentation/ evaluation of the Technology (if relevant)
Ministerio del Ambiente y los Recursos Naturales - Nicaragua (MARENA) - NicaraguaName of the institution(s) which facilitated the documentation/ evaluation of the Technology (if relevant)
SDC Swiss Agency for Development and Cooperation (SDC Swiss Agency for Development and Cooperation) - Switzerland1.5 Reference to Questionnaire(s) on SLM Approaches (documented using WOCAT)
2. Description of the SLM Technology
2.1 Short description of the Technology
Definition of the Technology:
Obras de bioingeniería para la reducción de erosión en áreas de alta vulnerabilidad en la cuenca del rió Dipilto
2.2 Detailed description of the Technology
Description:
Las obras están ubicadas en sitios críticos a lo largo de ocho tramos y/o lugares de referencia que van desde el santuario Mariano Virgen de la Piedra y la Intersección entre el río Dipilto y río La Tablazón. La principal característica de las obras es la combinación de obras grises (son las obras construidas como componentes con cemento, su nombre debe al color que toman estas obras una vez logrado su punto máximo de consistencia o fraguado por otro lado, hay obras relacionadas o complementarias a este tipo de construcciones por llevar elementos de colores similares por ejemplo piedra bolón, solida de rió en malla tipo Gavión) y material vegetativo, con el propósito de la estabilización de laderas, control de erosión y de arrastre de sedimentos en el área de influencia directa de las obras de captación futura que la Empresa Nicaragüense de Acueductos y Alcantarillado (ENACAL) implementará para el abastecimiento de agua potable a la población beneficiaria de la ciudad de Ocotal. Las principales actividades que se requieren para el establecimiento de la tecnología es la identificación de los sitios de vulnerabilidad, formulación y diseños de las obras a implementar en los sitios identificados, posteriormente se procede a la conformación y distribución de las actividades a desarrollar por sitio, siendo estos obras grises tales como: construcción de muros de retención en taludes y de construcción de Zampeados (recubrimiento de superficies con mampostería de piedra o tabique, concreto hidráulico o suelo-cemento, con el fin de protegerlas contra la erosión) en el caso de bioingeniería, el establecimiento de vegetación tipo vetiver (Chrysopogon zizanioides), caña Taiwan (Pennisetum purpureum), bambú (Phyllostachys aurea), e izotes (Yucca elephantipes). También se han conformado obras combinadas entre elementos constructivos tales como entramados vegetales, que consisten en la colocación de especies tipo bambú e izotes enlazados para proteger el área de deslizamiento y reducir la sedimentación, teniendo como base la construcción de muros de retención en concreto ciclópeo y muros de retención engavionados. Esta tecnología es de bajo costo y su implantación permite el uso de mano de obra no calificada, así como el material vegetativo y no vegetativo se encuentra disponible en la zona de influencia.
2.3 Photos of the Technology
2.5 Country/ region/ locations where the Technology has been applied and which are covered by this assessment
Country:
Nicaragua
Region/ State/ Province:
Departamento de Nueva Segovia.
Further specification of location:
Municipio de Dipilto. comunidad de Dipilto Nuevo
Specify the spread of the Technology:
- applied at specific points/ concentrated on a small area
Is/are the technology site(s) located in a permanently protected area?
Ja
If yes, specify:
se encuentra en un tramo de protección a la futura toma de agua, sobre la rivera del río a ambos lados del mismo, ubicada en el río Dipilto con una longitud de 5 kilómetros
Map
×2.6 Date of implementation
Indicate year of implementation:
2019
If precise year is not known, indicate approximate date:
- less than 10 years ago (recently)
2.7 Introduction of the Technology
Specify how the Technology was introduced:
- through projects/ external interventions
Comments (type of project, etc.):
Partiendo de la necesidad surgida con respeto a la obra de captación para el suministro del agua potable de la ciudad de Ocotal y garantizar la eficiencia del servicio, se dispuso a la implementación de obras bioingeniería para ayudar a la eficiencia del sistema requerido.
3. Classification of the SLM Technology
3.1 Main purpose(s) of the Technology
- reduce, prevent, restore land degradation
- conserve ecosystem
- protect a watershed/ downstream areas – in combination with other Technologies
- preserve/ improve biodiversity
- reduce risk of disasters
- adapt to climate change/ extremes and its impacts
3.2 Current land use type(s) where the Technology is applied
Land use mixed within the same land unit:
Ja
Specify mixed land use (crops/ grazing/ trees):
- Agroforestry
Settlements, infrastructure
- Settlements, buildings
- Traffic: roads, railways
3.3 Has land use changed due to the implementation of the Technology?
Has land use changed due to the implementation of the Technology?
- No (Continue with question 3.4)
3.4 Water supply
Water supply for the land on which the Technology is applied:
- rainfed
3.5 SLM group to which the Technology belongs
- improved ground/ vegetation cover
- ecosystem-based disaster risk reduction
3.6 SLM measures comprising the Technology
vegetative measures
- V2: Grasses and perennial herbaceous plants
structural measures
- S2: Bunds, banks
- S5: Dams, pans, ponds
- S6: Walls, barriers, palisades, fences
3.7 Main types of land degradation addressed by the Technology
soil erosion by water
- Wg: gully erosion/ gullying
- Wr: riverbank erosion
3.8 Prevention, reduction, or restoration of land degradation
Specify the goal of the Technology with regard to land degradation:
- prevent land degradation
- reduce land degradation
4. Technical specifications, implementation activities, inputs, and costs
4.1 Technical drawing of the Technology
Technical specifications (related to technical drawing):
Diques vegetados en el área de drenaje y/o cárcavas por donde salen grandes cantidades de sedimento. Estos diques tienen un promedio de 6.23 metros de longitud por 1.22 metros de altura.
Author:
Nestor Lopez
Date:
21/03/2019
Technical specifications (related to technical drawing):
La obra tiene 356 metros lineales, con estacas y/o postes verticales, con capacidad de rebrote puestas a distancias de entre 1 y 1.5 metros, unidas con estacas horizontales insertadas en los taludes, así como parales, varas o barules horizontales como contención de especies leñosas y bambú. Estos entramados poseen una altura variable de hasta 1 m, en pendientes menores de 30 % del talud, 0.80 m en pendientes de 30- 60 % del talud, 0.7 m en pendientes de 60 a 80% y 0.6 m en pendientes mayores al 80 % en el talud. Estos entramados poseen una altura variable de hasta 1 m en pendientes menores de 30 % del talud, 0.80 m en pendientes de 30- 60 % del talud, 0.7 m en pendientes de 60 a 80% y 0.6 m en pendientes mayores al 80 % en el talud.
Author:
Nestor Lopez
Date:
21/03/2019
Technical specifications (related to technical drawing):
Muro de tres niveles con cinco líneas de gaviones con celdas de 1 metros cúbicos fabricadas a partir de maya de triple torsión galvanizada con una dimensión aproximada de 50 metros de longitud, 2.00 metros de ancho, 2.00 metros de altura con un volumen total de 150 metros cubicos.
Author:
Nestor Lopez
Date:
21/03/2019
4.2 General information regarding the calculation of inputs and costs
Specify how costs and inputs were calculated:
- per Technology area
Indicate size and area unit:
50 hectáreas
other/ national currency (specify):
córdobas
If relevant, indicate exchange rate from USD to local currency (e.g. 1 USD = 79.9 Brazilian Real): 1 USD =:
33.13
4.3 Establishment activities
Activity | Timing (season) | |
---|---|---|
1. | Identificación de puntos críticos | Periodo seco |
2. | Formulación | Periodo seco |
3. | Evaluación | Periodo seco |
4. | Contratación | Periodo seco |
5. | Seguimiento y monitoreo | Periodo seco |
6. | Mantenimiento | Periodo seco |
4.4 Costs and inputs needed for establishment
Specify input | Unit | Quantity | Costs per Unit | Total costs per input | % of costs borne by land users | |
---|---|---|---|---|---|---|
Equipment | Enrocado de margen de río y encuasamiento | horas maquina | 35.0 | 11725.29 | 410385.15 | |
Construction material | Muros de retencion de gaviones | metros cubicos | 482.7 | 4617.62 | 2228925.17 | |
Construction material | Muro de contención de concretos ciclopeo de 16.5m3 | metros cubicos | 350.85 | 5104.73 | 1790994.52 | |
Other | obras de bioingenieria | unidades | 40.0 | 85705.61 | 3428224.4 | |
Total costs for establishment of the Technology | 7858529.24 | |||||
Total costs for establishment of the Technology in USD | 237202.81 |
4.5 Maintenance/ recurrent activities
Activity | Timing/ frequency | |
---|---|---|
1. | Riego | Verano |
2. | Podas de formación | invierno |
4.6 Costs and inputs needed for maintenance/ recurrent activities (per year)
Specify input | Unit | Quantity | Costs per Unit | Total costs per input | % of costs borne by land users | |
---|---|---|---|---|---|---|
Labour | Riego | días hombre | 240.0 | 150.0 | 36000.0 | |
Labour | Poda | días hombre | 60.0 | 150.0 | 9000.0 | |
Total costs for maintenance of the Technology | 45000.0 | |||||
Total costs for maintenance of the Technology in USD | 1358.29 |
4.7 Most important factors affecting the costs
Describe the most determinate factors affecting the costs:
Escases de materiales ty mano de obra calificada
5. Natural and human environment
5.1 Climate
Annual rainfall
- < 250 mm
- 251-500 mm
- 501-750 mm
- 751-1,000 mm
- 1,001-1,500 mm
- 1,501-2,000 mm
- 2,001-3,000 mm
- 3,001-4,000 mm
- > 4,000 mm
Agro-climatic zone
- sub-humid
5.2 Topography
Slopes on average:
- flat (0-2%)
- gentle (3-5%)
- moderate (6-10%)
- rolling (11-15%)
- hilly (16-30%)
- steep (31-60%)
- very steep (>60%)
Landforms:
- plateau/plains
- ridges
- mountain slopes
- hill slopes
- footslopes
- valley floors
Altitudinal zone:
- 0-100 m a.s.l.
- 101-500 m a.s.l.
- 501-1,000 m a.s.l.
- 1,001-1,500 m a.s.l.
- 1,501-2,000 m a.s.l.
- 2,001-2,500 m a.s.l.
- 2,501-3,000 m a.s.l.
- 3,001-4,000 m a.s.l.
- > 4,000 m a.s.l.
Indicate if the Technology is specifically applied in:
- concave situations
5.3 Soils
Soil depth on average:
- very shallow (0-20 cm)
- shallow (21-50 cm)
- moderately deep (51-80 cm)
- deep (81-120 cm)
- very deep (> 120 cm)
Soil texture (topsoil):
- coarse/ light (sandy)
Soil texture (> 20 cm below surface):
- coarse/ light (sandy)
Topsoil organic matter:
- medium (1-3%)
5.4 Water availability and quality
Ground water table:
on surface
Availability of surface water:
good
Water quality (untreated):
poor drinking water (treatment required)
Water quality refers to:
surface water
Is water salinity a problem?
Nee
Is flooding of the area occurring?
Nee
5.5 Biodiversity
Species diversity:
- medium
Habitat diversity:
- medium
5.6 Characteristics of land users applying the Technology
Indicate other relevant characteristics of the land users:
no aplica
5.7 Average area of land used by land users applying the Technology
- < 0.5 ha
- 0.5-1 ha
- 1-2 ha
- 2-5 ha
- 5-15 ha
- 15-50 ha
- 50-100 ha
- 100-500 ha
- 500-1,000 ha
- 1,000-10,000 ha
- > 10,000 ha
Is this considered small-, medium- or large-scale (referring to local context)?
- small-scale
5.8 Land ownership, land use rights, and water use rights
Land ownership:
- individual, titled
Land use rights:
- individual
Water use rights:
- communal (organized)
Are land use rights based on a traditional legal system?
Ja
Specify:
Escrituras y títulos de propiedad
5.9 Access to services and infrastructure
health:
- poor
- moderate
- good
education:
- poor
- moderate
- good
technical assistance:
- poor
- moderate
- good
employment (e.g. off-farm):
- poor
- moderate
- good
markets:
- poor
- moderate
- good
energy:
- poor
- moderate
- good
roads and transport:
- poor
- moderate
- good
drinking water and sanitation:
- poor
- moderate
- good
financial services:
- poor
- moderate
- good
6. Impacts and concluding statements
6.1 On-site impacts the Technology has shown
Ecological impacts
Water cycle/ runoff
water quality
Soil
soil loss
Biodiversity: vegetation, animals
Vegetation cover
Climate and disaster risk reduction
flood impacts
landslides/ debris flows
micro-climate
6.2 Off-site impacts the Technology has shown
reliable and stable stream flows in dry season
6.3 Exposure and sensitivity of the Technology to gradual climate change and climate-related extremes/ disasters (as perceived by land users)
Climate-related extremes (disasters)
Meteorological disasters
How does the Technology cope with it? | |
---|---|
local rainstorm | not known |
Hydrological disasters
How does the Technology cope with it? | |
---|---|
flash flood | not known |
6.6 Adaptation
Has the Technology been modified recently to adapt to changing conditions?
Nee
6.7 Strengths/ advantages/ opportunities of the Technology
Strengths/ advantages/ opportunities in the compiler’s or other key resource person’s view |
---|
Obras de protección de Taludes y reducción de sedimentos; obra de bajos recursos, obra de alto impacto, disponibilidad de material vegetativo en la zona. |
6.8 Weaknesses/ disadvantages/ risks of the Technology and ways of overcoming them
Weaknesses/ disadvantages/ risks in the compiler’s or other key resource person’s view | How can they be overcome? |
---|---|
Costos de mantenimiento en una obra de carácter comunitarios |
Fortalecer la organización comunitaria. La comunidad y el gobierno municipal de Dipilto comparten el mantenimiento de las obras. |
7. References and links
7.1 Methods/ sources of information
- field visits, field surveys
uno
- interviews with SLM specialists/ experts
dos
- compilation from reports and other existing documentation
documento de formulación de la obras.
When were the data compiled (in the field)?
21/03/2019
7.3 Links to relevant online information
Title/ description:
Documento de resumen de proceso de diseño de obras de control de erosión y arrastre de sedimentos propuestas en el área de influencia directa e indirecta de obra de captación futura del sistema de agua potable de la ciudad de Ocotal, Nueva Segovia, Nicaragua. ENACAL 8 de marzo 2018.
Links and modules
Expand all Collapse allLinks
No links