بيانات المستخدم

معلومات

الاسم الأول:

Torben

اسم العائلة:

Helbig

الاستمارات المتاحة للعامة

Integrated Soil Fertility Management (ISFM)
approaches

Integrated Soil Fertility Management (ISFM) [أثيوبيا]

The Integrated Soil Fertility Management (ISFM) approach has been adopted under the Integrated Soil Fertility Management Project (ISFM+). It was introduced as a quick-win solution to increase both crop and biomass production through the incremental promotion of varied but complementary technology packages.

  • جامع المعلومات: GERBA LETA
Participatory Rehabilitation of Dry Valleys
approaches

Participatory Rehabilitation of Dry Valleys [أثيوبيا]

Participatory rehabilitation and productive use of dry valleys is an approach employed to rehabilitate degraded and degradable land. It is operationalised through the Lowland Soil Rehabilitation Project with local development partners from kebele, district, regional agricultural bureaus, and other relevant stakeholders.

  • جامع المعلومات: GERBA LETA
Double Basin Masonry Check Dam
technologies

Double Basin Masonry Check Dam [أثيوبيا]

A double basin masonry check dam is a physical structure that helps to stop gully formation or further development of gullies in dry valleys. It rehabilitates small to a medium-sized deep gullies that are eating into the heart of adjacent land.

  • جامع المعلومات: GERBA LETA

المجموع: 4