The site of Geen Einde is typical of many areas in Lebowa: a large gully approximately 200 m wide and 10 m deep in places with semi-eroded pedestals remaining. Flood waters from the mountain meanders causes further gouging of the sides of the pedestals. Tributary gullies have formed in the highly erodible soil (high clay content) adjacent to the main gully. Signs of old contour bunds indicate that the land was cultivated in the past.
1. An earth silt dam was mechanically constructed across the main erosion gully.
2. Several gabion structures were constructed in the minor gullies.
3. Vetiver grass was planted in the silt to act as nursery material for future planting.
4. Old motor tyres were laid on a level contour above the minor gullies to harvest water.
5. Several species of indigenous trees were planted in the gullies and along the rows of tyres.
6. Two Agave species, local aloes and vetiver grass were planted along level contours.
7. Agave was planted along the edges of the gullies.
8. Shallow gullies were stabilised with old tyres and Agave.
9. Couch grass (Cynodon dactylon) was planted at a few places in the gullies and along the rows of tyres.
The main reason for these actions was to reduce the water velocity.
ទីតាំង: Sekhukhunenland, Limpopo Province, ប្រទេសអាហ្រ្វិកខាងត្បូង
ចំនួនទីកន្លែងបច្ចេកទេស ដែលវិភាគ:
ការសាយភាយនៃបច្ចេកទេស: ត្រូវបានផ្សព្វផ្សាយត្រឹមតំបន់មួយ (0.1 km²)
តើស្ថិតក្នុងតំបន់ការពារអចិន្ត្រៃយ៍?:
កាលបរិច្ឆេទនៃការអនុវត្ត: តិចជាង 10ឆ្នាំមុន (ថ្មី)
ប្រភេទនៃការណែនាំឱ្យអនុវត្តន៍៖
បញ្ជាក់ពីធាតុចូល | ឯកតា | បរិមាណ | ថ្លៃដើមក្នុងមួយឯកតា (rand) | ថ្លៃធាតុចូលសរុប (rand) | % នៃថ្លៃដើមដែលចំណាយដោយអ្នកប្រើប្រាស់ដី |
កម្លាំងពលកម្ម | |||||
Labour | ha | 1,0 | 83,35 | 83,35 | |
សម្ភារៈ | |||||
Machine use | ha | 1,0 | 11,0 | 11,0 | |
សម្ភារៈដាំដុះ | |||||
Trees | ha | 1,0 | 888,0 | 888,0 | |
ផ្សេងៗ | |||||
tyre transport | ha | 1,0 | 138,0 | 138,0 | 100,0 |
ថ្លៃដើមសរុបក្នុងការបង្កើតបច្ចេកទេស | 1'120.35 | ||||
ថ្លៃដើមសរុបក្នុងការបង្កើតបច្ចេកទេសគិតជាដុល្លារ | 186.72 |
stabilised gullies can be used for production, in Lesotho such gullies are allocated
relatively cheap method using old tyres and ripper, the main expense is transporting the tyres
គុណភាពមុន SLM: 50
គុណភាពក្រោយ SLM: 10
គុណភាពមុន SLM: 8
គុណភាពក្រោយ SLM: 2
Not sure if reason is technology