Masonry micro-dams [Mali]
- Creation:
- Update:
- Compiler: Dieter Nill
- Editor: –
- Reviewer: Deborah Niggli
Micro-barrage en pierres maçonnées (French)
technologies_1632 - Mali
View sections
Expand all Collapse all1. General information
1.2 Contact details of resource persons and institutions involved in the assessment and documentation of the Technology
SLM specialist:
Kone Mamadou Gallo
gallokone@yahoo.fr
IPRO-DB Bélédougou
Mali
SLM specialist:
Schneider Ralf
ralf_schneider5@hotmail.com
IPRO-DB Bélédougou
Mali
Name of project which facilitated the documentation/ evaluation of the Technology (if relevant)
Manual of Good Practices in Small Scale Irrigation in the Sahel (GIZ )Name of the institution(s) which facilitated the documentation/ evaluation of the Technology (if relevant)
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH (GIZ) - Germany1.3 Conditions regarding the use of data documented through WOCAT
When were the data compiled (in the field)?
01/07/2012
The compiler and key resource person(s) accept the conditions regarding the use of data documented through WOCAT:
Yes
1.4 Declaration on sustainability of the described Technology
Is the Technology described here problematic with regard to land degradation, so that it cannot be declared a sustainable land management technology?
No
2. Description of the SLM Technology
2.1 Short description of the Technology
Definition of the Technology:
The role of masonry micro-dams is to raise the level of the water table so as to supply wells and create water reserves for off-season farming activities.
2.2 Detailed description of the Technology
Description:
A masonry micro-dam is a structure built of dressed stone pointed with cement mortar. The width of the crest is 0.75 metres. The length generally ranges from 100 to 200 metres depending on the site. The height varies between two and four metres. The dam creates a water reservoir upstream covering an area of around 5 to 15 hectares. Micro-dams are equipped with buttresses and a stilling basin. Each dam has a sluice fitted with a stoplog gate for draining away sediment during the first rains of the season and to regulate water levels. The use of stoplog gates is recommended instead of sluice gates, as the latter are more technically sophisticated and require more maintenance. Farming is carried out upstream and downstream in the rainy season and off-season.
The dam increases the amount of available surface water during the rainy season and groundwater during the off-season. This results in increasing the farmland area as well as yields and production. A second growing season is made possible. Its effect on the water table depends on the depth of the scheme’s foundations: the deeper the foundations, the greater the recharge of ground water. During the rainy season, the lands are used for rice growing. The wells used for irrigating market gardens are fed from the water table, meaning vegetables can be grown off-season. The water is also used for watering livestock, fish farming and, sometimes, domestic purposes.
Implementation steps: An information and awareness-raising workshop is organised on the IPRO-DB approach at the commune level, involving the villages affected by the project. A general meeting is held to secure the support of the whole village for the development request. The village chief and commune mayor sign off the request. The project team carries out a scoping study and socio-economic surveys. If the outcomes of the scoping study phase and socio-economic surveys are positive, the terms of reference are drawn up for working with consultancies. Consultancies are selected through tender processes to carry out the technical studies and create the invitation to tender document. The project team monitors the consultancies’ delivery of the technical studies. The village pays its financial contribution towards the project. The management committee is set up and organisational and technical training is provided to beneficiaries. Exchange visits are organised with villages that have experience in installing these schemes. The project team, village, mayor and company sign the memorandum of understanding. Stone breaking gets underway. Landowners sign the transfer deeds for the site. The invitation to tender for the building works is published and the contractor selected. The invitation to tender for works supervision is published and the supervisory consultancy selected. The building contractor and supervisory consultancy are introduced to the village and begin the building work. Local labour is employed in building the scheme. Partial acceptance of the building works (for example, foundations, wall, buttresses, stilling basin, gabion reinforcements, etc.) is granted. The project team monitors the building works. Payment for activities is made on a unit-price basis. Interim acceptance is granted. Final acceptance is granted after one year.
A management committee takes charge of opening and closing stoplog gates, organises the maintenance of the scheme and institutes additional measures to protect the scheme (gabions, stone bunds, etc.). It collects and manages maintenance fees, ensures the committee’s rules of procedure are adhered to and organises meetings of local producers. With minimum levels of maintenance, a scheme will remain functional for at least 20 years.
Around 60 masonry dams have been built or rehabilitated in the Bandiagara and Bélédougou areas.
2.5 Country/ region/ locations where the Technology has been applied and which are covered by this assessment
Country:
Mali
Region/ State/ Province:
Mali
Further specification of location:
Bandiagara and Bélédougou area
2.6 Date of implementation
If precise year is not known, indicate approximate date:
- 10-50 years ago
2.7 Introduction of the Technology
Specify how the Technology was introduced:
- through projects/ external interventions
Comments (type of project, etc.):
This type of dam has been built since the 1990s, by IPRO-DB
3. Classification of the SLM Technology
3.1 Main purpose(s) of the Technology
- reduce, prevent, restore land degradation
3.2 Current land use type(s) where the Technology is applied
Cropland
- Annual cropping
Mixed (crops/ grazing/ trees), incl. agroforestry
- Agro-pastoralism
Comments:
Major land use problems (compiler’s opinion): lack of surface water and groundwater
3.3 Further information about land use
Water supply for the land on which the Technology is applied:
- mixed rainfed-irrigated
Number of growing seasons per year:
- 1
Specify:
Longest growing period in days: 120, Longest growing period from month to month: August-November
Livestock density (if relevant):
1-10 LU /km2
3.4 SLM group to which the Technology belongs
- irrigation management (incl. water supply, drainage)
- water diversion and drainage
- surface water management (spring, river, lakes, sea)
3.5 Spread of the Technology
Specify the spread of the Technology:
- evenly spread over an area
If the Technology is evenly spread over an area, indicate approximate area covered:
- 1-10 km2
Comments:
Bélédougou area; in the villages of Kenekolo, Nonkon, Tiembougou, Tienko, Korokabougou and Bamabougou in Kolokani Circle; Sonikegny and Sognebougou in Kati Circle.
Around 60 masonry dams have been built or rehabilitated in the Bandiagara and Bélédougou areas.
3.6 SLM measures comprising the Technology
structural measures
- S5: Dams, pans, ponds
3.7 Main types of land degradation addressed by the Technology
biological degradation
- Bc: reduction of vegetation cover
water degradation
- Ha: aridification
- Hg: change in groundwater/aquifer level
Comments:
Main causes of degradation: over abstraction / excessive withdrawal of water (for irrigation, industry, etc.)
3.8 Prevention, reduction, or restoration of land degradation
Specify the goal of the Technology with regard to land degradation:
- prevent land degradation
- restore/ rehabilitate severely degraded land
4. Technical specifications, implementation activities, inputs, and costs
4.1 Technical drawing of the Technology
4.2 Technical specifications/ explanations of technical drawing
A masonry micro-dam is a structure built of dressed stone pointed with cement mortar. The width
of the crest is 0.75 metres. The length generally ranges from 100 to 200 metres depending on
the site. The height varies between two and four metres. The dam creates a water reservoir
upstream covering an area of around 5 to 15 hectares. Micro-dams are equipped with buttresses
and a stilling basin. Each dam has a sluice fitted with a stoplog gate for draining away sediment
during the first rains of the season and to regulate water levels.
Technical knowledge required for field staff / advisors: high
Technical knowledge required for land users: low
Main technical functions: increase of infiltration, increase / maintain water stored in soil, increase of groundwater level / recharge of groundwater, water harvesting / increase water supply, water spreading
Dam/ pan/ pond
Height of bunds/banks/others (m): 2-4
Width of bunds/banks/others (m): 0.75
Length of bunds/banks/others (m): 100-200
4.3 General information regarding the calculation of inputs and costs
other/ national currency (specify):
CFA Franc
Indicate exchange rate from USD to local currency (if relevant): 1 USD =:
517.0
4.4 Establishment activities
Activity | Type of measure | Timing | |
---|---|---|---|
1. | information and awareness-raising workshop | Structural | |
2. | village chief and commune mayor sign off the request | Structural | |
3. | project team carries out a scoping study and socio-economicsurveys | Structural | |
4. | Consultancies are selectedthrough tender processes to carry out the technical studies | Structural | |
5. | management committee is set up and organisational andtechnical training is provided to beneficiaries | Structural | |
6. | Exchange visits are organised with villages that have experience ininstalling these schemes. | Structural | |
7. | building contractor and supervisory consultancy are introduced to the village and begin thebuilding work. Local labour is employed in building the scheme. | Structural |
4.5 Costs and inputs needed for establishment
Specify input | Unit | Quantity | Costs per Unit | Total costs per input | % of costs borne by land users | |
---|---|---|---|---|---|---|
Other | total construction | 1.0 | 273817.0 | 273817.0 | 100.0 | |
Total costs for establishment of the Technology | 273817.0 |
4.6 Maintenance/ recurrent activities
Activity | Type of measure | Timing/ frequency | |
---|---|---|---|
1. | a management committee takes charge of opening and closing stoplog gates, organises themaintenance of the scheme and institutes additional measures to protect the scheme (gabions,stone bunds, etc.). It collects and manages maintenance fees, ensures the committee’s rules ofprocedure are adhered to and organises meetings of local producers | Structural |
4.8 Most important factors affecting the costs
Describe the most determinate factors affecting the costs:
Each dam costs between 100 and 140 million CFA francs (195'583-273'817 Dollar). Costs are reduced as a result of the availability of local materials and the fact that local masons and contractors are well versed in this type of technology.
5. Natural and human environment
5.1 Climate
Annual rainfall
- < 250 mm
- 251-500 mm
- 501-750 mm
- 751-1,000 mm
- 1,001-1,500 mm
- 1,501-2,000 mm
- 2,001-3,000 mm
- 3,001-4,000 mm
- > 4,000 mm
Agro-climatic zone
- semi-arid
Thermal climate class: tropics
5.2 Topography
Slopes on average:
- flat (0-2%)
- gentle (3-5%)
- moderate (6-10%)
- rolling (11-15%)
- hilly (16-30%)
- steep (31-60%)
- very steep (>60%)
Landforms:
- plateau/plains
- ridges
- mountain slopes
- hill slopes
- footslopes
- valley floors
Altitudinal zone:
- 0-100 m a.s.l.
- 101-500 m a.s.l.
- 501-1,000 m a.s.l.
- 1,001-1,500 m a.s.l.
- 1,501-2,000 m a.s.l.
- 2,001-2,500 m a.s.l.
- 2,501-3,000 m a.s.l.
- 3,001-4,000 m a.s.l.
- > 4,000 m a.s.l.
5.3 Soils
Soil depth on average:
- very shallow (0-20 cm)
- shallow (21-50 cm)
- moderately deep (51-80 cm)
- deep (81-120 cm)
- very deep (> 120 cm)
Soil texture (topsoil):
- medium (loamy, silty)
- fine/ heavy (clay)
Topsoil organic matter:
- medium (1-3%)
- low (<1%)
5.4 Water availability and quality
Ground water table:
5-50 m
Availability of surface water:
medium
Water quality (untreated):
for agricultural use only (irrigation)
5.5 Biodiversity
Species diversity:
- medium
5.6 Characteristics of land users applying the Technology
Off-farm income:
- 10-50% of all income
Relative level of wealth:
- poor
- average
Level of mechanization:
- manual work
Gender:
- men
Indicate other relevant characteristics of the land users:
Population density: < 10 persons/km2
Annual population growth: 2% - 3%
10% of the land users are rich.
50% of the land users are average wealthy.
30% of the land users are poor.
10% of the land users are very poor.
5.7 Average area of land owned or leased by land users applying the Technology
- < 0.5 ha
- 0.5-1 ha
- 1-2 ha
- 2-5 ha
- 5-15 ha
- 15-50 ha
- 50-100 ha
- 100-500 ha
- 500-1,000 ha
- 1,000-10,000 ha
- > 10,000 ha
Is this considered small-, medium- or large-scale (referring to local context)?
- small-scale
5.8 Land ownership, land use rights, and water use rights
Comments:
The irrigated land is allocated by the chief
5.9 Access to services and infrastructure
health:
- poor
- moderate
- good
education:
- poor
- moderate
- good
technical assistance:
- poor
- moderate
- good
employment (e.g. off-farm):
- poor
- moderate
- good
markets:
- poor
- moderate
- good
energy:
- poor
- moderate
- good
roads and transport:
- poor
- moderate
- good
drinking water and sanitation:
- poor
- moderate
- good
financial services:
- poor
- moderate
- good
6. Impacts and concluding statements
6.1 On-site impacts the Technology has shown
Socio-economic impacts
Production
crop production
risk of production failure
production area
Income and costs
farm income
Socio-cultural impacts
food security/ self-sufficiency
conflict mitigation
Contribution to human well-being
Comments/ specify:
Better levels of production increase producers’ incomes and improve living conditions.
Ecological impacts
Water cycle/ runoff
water quantity
harvesting/ collection of water
groundwater table/ aquifer
Soil
soil moisture
6.3 Exposure and sensitivity of the Technology to gradual climate change and climate-related extremes/ disasters (as perceived by land users)
Gradual climate change
Gradual climate change
Season | Type of climatic change/ extreme | How does the Technology cope with it? | |
---|---|---|---|
annual temperature | increase | well |
Climate-related extremes (disasters)
Meteorological disasters
How does the Technology cope with it? | |
---|---|
local rainstorm | well |
local windstorm | well |
Climatological disasters
How does the Technology cope with it? | |
---|---|
drought | well |
Hydrological disasters
How does the Technology cope with it? | |
---|---|
general (river) flood | well |
Other climate-related consequences
Other climate-related consequences
How does the Technology cope with it? | |
---|---|
reduced growing period | well |
6.4 Cost-benefit analysis
How do the benefits compare with the establishment costs (from land users’ perspective)?
Short-term returns:
positive
Long-term returns:
positive
How do the benefits compare with the maintenance/ recurrent costs (from land users' perspective)?
Short-term returns:
positive
Long-term returns:
positive
6.7 Strengths/ advantages/ opportunities of the Technology
Strengths/ advantages/ opportunities in the compiler’s or other key resource person’s view |
---|
Micro-dams increase farmland area, yields and production. Better levels of production increase producers’ incomes and improve living conditions. |
Generates employment throughout the year. Seasonal outmigration is reduced. |
With minimum levels of maintenance, a scheme will remain functional for at least 20 years. |
raise the level of the water table to supply wells and create water reserves for off-season farming activities |
6.8 Weaknesses/ disadvantages/ risks of the Technology and ways of overcoming them
Weaknesses/ disadvantages/ risks in the compiler’s or other key resource person’s view | How can they be overcome? |
---|---|
Beneficiaries occasionally fail to monitor and maintain schemes. | |
lack of quality rubble |
7. References and links
7.1 Methods/ sources of information
- field visits, field surveys
- interviews with land users
7.2 References to available publications
Title, author, year, ISBN:
IPRO-DB (2007): Fiches techniques des barrages individuels. [Data sheet on individual dams]
Title, author, year, ISBN:
Manual of Good Practices in Small Scale Irrigation in the Sahel. Experiences from Mali. Published by GIZ in 2014.
Available from where? Costs?
http://star-www.giz.de/starweb/giz/pub/servlet.starweb
Title, author, year, ISBN:
IPRO-DB: Module de formation pour la préparation des aménagements [Training module on preparing schemes] (avail-able in French and Bambara)
Title, author, year, ISBN:
IPRO-DB: Module de formation sur l’entretien des ouvrages [Training module on scheme maintenance] (available in French and Bambara)
Title, author, year, ISBN:
IPRO-DB: Approches du projet de l’irrigation de proximité au Pays Dogon et dans le Bélédougou [Small-scale irrigation project approaches in Dogon Country and in the Bélédougou region], (O. Fritz, Technical Assistant, GIZ, December 2011)
Links and modules
Expand all Collapse allLinks
No links
Modules
No modules