技术

Dejen Stone Bund [埃塞俄比亚]

Gidad, Irken

technologies_1059 - 埃塞俄比亚

完整性: 71%

1. 一般信息

1.3 关于使用通过WOCAT记录的数据的条件

编制者和关键资源人员接受有关使用通过WOCAT记录数据的条件。:

2. SLM技术的说明

2.1 技术简介

技术定义:

Stone bund is an enbankment of stone constructed acrros the slope following the contour.

2.2 技术的详细说明

说明:

It is a stone wall stablized with grasses and fodder plant species. Its main purpose is moisture harvesting and soil erosion control. Establishment is made first by laying out contour lines, digging foundation and placing of stones in a manner to interlock to each other. Stone bunds placed on contour are known as level stone bunds. The purpose is to arrest runoff and enhance soil moisture to increaseavailability of water to plants. It is also aimed at controlling soil erosion from cultivated fields such that the plants have sufficient soil depth to establish and grow. Maintenance is done every year especially before thev rains. Maintenance continues for several years until the slope of the terraced land forms nearly level bench or slightly sloping outward terrace. The technology is suitable to semi-arid and arid climatic conditions having steep to very steep cultivated lands. It is suitable to major annual cereal crops, perennial crops, fruit trees and cash crops.

2.3 技术照片

2.5 已应用该技术的、本评估所涵盖的国家/地区/地点

国家:

埃塞俄比亚

区域/州/省:

Amhara/Dejen

有关地点的进一步说明:

Dejen-Inemay

注释:

Total area covered by the SLM Technology is 10 km2.

The technology is applied mostly on the low land part of the woreda.

2.6 实施日期

如果不知道确切的年份,请说明大概的日期:
  • 不到10年前(最近)

2.7 技术介绍

详细说明该技术是如何引入的:
  • 通过项目/外部干预
注释(项目类型等):

Originally it is indiginous and now some improvement techniques have been included.

3. SLM技术的分类

3.1 该技术的主要目的

  • 改良生产
  • 减少、预防、恢复土地退化

3.2 应用该技术的当前土地利用类型

农田

农田

  • 一年一作
  • 乔木与灌木的种植
年作 - 具体指明作物:
  • 谷类 - 其他
  • 谷类 - 高粱
  • 油料作物 - 向日葵、菜籽、其他
  • teff,
乔木和灌木种植 - 指定作物:
  • 水果、其他
  • sugar cane, Sesbania, leucaena
每年的生长季节数:
  • 1
具体说明:

Longest growing period in days: 210

采用轮作制度了吗?:

如果是,请具体说明:

sorghum-teff-sorghum

注释:

Major land use problems (compiler’s opinion): Overgrazing with little vegetation cover and exposed surface, cultivating on very steep slopes.

Major land use problems (land users’ perception): Low productivity of land, erosion, low soil fertility and surface stoniness.

Type of cropping system and major crops comments: sorghum-teff-sorghum

3.4 供水

该技术所应用土地的供水:
  • 雨养
注释:

Water supply: Also mixed rainfed - irrigated

3.5 该技术所属的SLM组

  • 横坡措施

3.6 包含该技术的可持续土地管理措施

3.7 该技术强调的主要土地退化类型

土壤水蚀

土壤水蚀

  • Wt:表土流失/地表侵蚀
  • Wg:冲沟侵蚀/沟蚀
化学性土壤退化

化学性土壤退化

  • Cn:肥力下降和有机质含量下降(非侵蚀所致)
注释:

Main type of degradation addressed: Wt: loss of topsoil / surface erosion

Secondary types of degradation addressed: Wg: gully erosion / gullying, Cn: fertility decline and reduced organic matter content

3.8 防止、减少或恢复土地退化

具体数量名该技术与土地退化有关的目标:
  • 减少土地退化
注释:

Secondary goals: prevention of land degradation, rehabilitation / reclamation of denuded land

4. 技术规范、实施活动、投入和成本

4.1 该技术的技术图纸

技术规范(与技术图纸相关):

Amhara

Technical knowledge required for field staff / advisors: moderate

Technical knowledge required for land users: moderate

Main technical functions: control of dispersed runoff: retain / trap

Secondary technical functions: reduction of slope angle, reduction of slope length, increase of infiltration, water harvesting / increase water supply

Better crop cover
Material/ species: Sorghum, Teff, Suflower
Remarks: broad cast

Contour planting / strip cropping
Material/ species: Sesbania, leucaena
Remarks: by planting across the slope

Agronomic measure: removing less vegetation cover
Material/ species: Crop residue, grasses
Remarks: across the slope

Mineral (inorganic) fertilizers
Material/ species: DAP/Urea
Quantity/ density: 150 Kg/ha
Remarks: Sown by broadcasting

Contour tillage
Remarks: oxen plough

Pits
Remarks: hand pick axe

Aligned: -contour
Vegetative material: T : trees / shrubs
Number of plants per (ha): 1500
Vertical interval between rows / strips / blocks (m): 1m
Spacing between rows / strips / blocks (m): 5 m
Vertical interval within rows / strips / blocks (m): 1m
Width within rows / strips / blocks (m): 2m

Scattered / dispersed
Vegetative material: T : trees / shrubs
Number of plants per (ha): 500
Spacing between rows / strips / blocks (m): 5m
Width within rows / strips / blocks (m): 10m

Trees/ shrubs species: sesbania

Grass species: local

Slope (which determines the spacing indicated above): 15.00%

If the original slope has changed as a result of the Technology, the slope today is (see figure below): 10.00%

Gradient along the rows / strips: 0.00%

Bund/ bank: level
Vertical interval between structures (m): 2m
Spacing between structures (m): 10m
Height of bunds/banks/others (m): 0.45m
Width of bunds/banks/others (m): 0.45m
Length of bunds/banks/others (m): 80m

Structural measure: diversion ditch / cut-off drain
Depth of ditches/pits/dams (m): 0.4m
Width of ditches/pits/dams (m): 0.3m
Length of ditches/pits/dams (m): 58m
Height of bunds/banks/others (m): 0.75m
Width of bunds/banks/others (m): 1.0m
Length of bunds/banks/others (m): 58m

Construction material (earth): reinforce the stone embankment

Construction material (stone): strengthen/support the terrace wall

Slope (which determines the spacing indicated above): 15%

If the original slope has changed as a result of the Technology, the slope today is: 10%

Lateral gradient along the structure: 0%

Vegetation is used for stabilisation of structures.

Other type of management: change of management / intensity level - from random/open access to controlled system

4.2 有关投入和成本计算的一般信息

其它/国家货币(具体说明):

Birr

如相关,注明美元与当地货币的汇率(例如1美元=79.9巴西雷亚尔):1美元=:

8.6

注明雇用劳工的每日平均工资成本:

0.70

4.3 技术建立活动

活动 时间(季度)
1. preparation of seedlings dry season
2. transporting of seedlings rainy season
3. plantation on bund rainy season
4. surveying dry season
5. collecting of stones dry season
6. constructing the bund dry season
7. Seek solution for the management problems before harvesting
8. controlling the development activities by guarding from free grazing animals. after harvesting
9. discussing on management and measures before harvesting

4.4 技术建立所需要的费用和投入

对投入进行具体说明 单位 数量 单位成本 每项投入的总成本 土地使用者承担的成本%
劳动力 Labour ha 1.0 236.0 236.0 100.0
设备 Tools ha 1.0 6.0 6.0 100.0
植物材料 Seedlings ha 1.0 58.0 58.0 100.0
施工材料 Stone ha 1.0 83.0 83.0 100.0
技术建立所需总成本 383.0
技术建立总成本,美元 44.53
注释:

Duration of establishment phase: 24 month(s)

4.5 维护/经常性活动

活动 时间/频率
1. Contour ploughing dry season / three times
2. Harrowing dry season / one time
3. Planting wet season / one time
4. Temporary trashline dry -rainy season /
5. Residues dry season / many times
6. Weeding rainy season / two times
7. Harvest dry season / annual
8. cutting/prunnig dry season /after and befor cropping
9. repair breaks dry season/annually

4.6 维护/经常性活动所需要的费用和投入(每年)

对投入进行具体说明 单位 数量 单位成本 每项投入的总成本 土地使用者承担的成本%
劳动力 Labour ha 1.0 30.0 30.0 100.0
植物材料 Seedlings ha 1.0 30.0 30.0 100.0
施工材料 Stone ha 1.0 12.0 12.0 100.0
技术维护所需总成本 72.0
技术维护总成本,美元 8.37
注释:

Machinery/ tools: hoe, sickle, axe, pad, spane

length of structure per ha of land protected

4.7 影响成本的最重要因素

描述影响成本的最决定性因素:

slope, soil depth

5. 自然和人文环境

5.1 气候

年降雨量
  • < 250毫米
  • 251-500毫米
  • 501-750毫米
  • 751-1,000毫米
  • 1,001-1,500毫米
  • 1,501-2,000毫米
  • 2,001-3,000毫米
  • 3,001-4,000毫米
  • > 4,000毫米
农业气候带
  • 半湿润

5.2 地形

平均坡度:
  • 水平(0-2%)
  • 缓降(3-5%)
  • 平缓(6-10%)
  • 滚坡(11-15%)
  • 崎岖(16-30%)
  • 陡峭(31-60%)
  • 非常陡峭(>60%)
地形:
  • 高原/平原
  • 山脊
  • 山坡
  • 山地斜坡
  • 麓坡
  • 谷底
垂直分布带:
  • 0-100 m a.s.l.
  • 101-500 m a.s.l.
  • 501-1,000 m a.s.l.
  • 1,001-1,500 m a.s.l.
  • 1,501-2,000 m a.s.l.
  • 2,001-2,500 m a.s.l.
  • 2,501-3,000 m a.s.l.
  • 3,001-4,000 m a.s.l.
  • > 4,000 m a.s.l.
关于地形的注释和进一步规范:

Slopes on average: Hilly (mostly terraced by stone bunds). Also rolling (ranked 2) and steep (ranked 3)

5.3 土壤

平均土层深度:
  • 非常浅(0-20厘米)
  • 浅(21-50厘米)
  • 中等深度(51-80厘米)
  • 深(81-120厘米)
  • 非常深(> 120厘米)
土壤质地(表土):
  • 粗粒/轻(砂质)
表土有机质:
  • 低(<1%)
如有可能,附上完整的土壤描述或具体说明可用的信息,例如土壤类型、土壤酸碱度、阳离子交换能力、氮、盐度等。:

Soil fertility is low-very low
Soil drainage/ infiltration is good-medium
Soil water storage capacity is low-very low

5.6 应用该技术的土地使用者的特征

生产系统的市场定位:
  • 生计(自给)
非农收入:
  • 低于全部收入的10%
相对财富水平:
  • 非常贫瘠
  • 贫瘠
机械化水平:
  • 手工作业
  • 畜力牵引
说明土地使用者的其他有关特征:

Population density: 50-100 persons/km2

Annual population growth: 2% - 3%

and own 50% of the land.
and own 40% of the land.
and own 10% of the land.

Off-farm income specification: In the land with proper conservation techniques the productivity increased by about two folds whereas the land with out conservation measures yield is seen to decrease

5.7 应用该技术的土地使用者使用的平均土地面积

  • < 0.5 公顷
  • 0.5-1 公顷
  • 1-2 公顷
  • 2-5公顷
  • 5-15公顷
  • 15-50公顷
  • 50-100公顷
  • 100-500公顷
  • 500-1,000公顷
  • 1,000-10,000公顷
  • > 10,000公顷
注释:

Grazing land: Far away from homesteads.

5.8 土地所有权、土地使用权和水使用权

土地所有权:

6. 影响和结论性说明

6.1 该技术的现场影响

社会经济效应

生产

作物生产

降低
增加

饲料生产

降低
增加
注释/具体说明:

Due to bund plantation

饲料质量

降低
增加
注释/具体说明:

Due to bund plantation

生产区域

降低
增加
注释/具体说明:

The loss is only for the first two years

收入和成本

农业收入

降低
增加

社会文化影响

社区机构

削弱
加强

冲突缓解

恶化
改良
注释/具体说明:

Because of placements of cutoff drains

生态影响

水循环/径流

多余水的排放

减少
改良
土壤

土壤覆盖层

减少
改良

6.2 该技术的场外影响已经显现

下游洪水

增加
减少
注释/具体说明:

Sediment trapped on the bunds

6.4 成本效益分析

技术收益与技术建立成本相比如何(从土地使用者的角度看)?
短期回报:

消极

长期回报:

稍微积极

技术收益与技术维护成本/经常性成本相比如何(从土地使用者的角度看)?
短期回报:

轻度消极

长期回报:

稍微积极

6.5 技术采用

在所有采用这项技术的人当中,有多少人是自发的,即未获得任何物质奖励/付款?:
  • 91-100%
注释:

320 land user families have adopted the Technology without any external material support

Comments on spontaneous adoption: estimates

There is a moderate trend towards spontaneous adoption of the Technology

Comments on adoption trend: Farmers in the near by village are gradually adopting good lessons learnet from farmers who have implemented the technology. As a result the technology is expanding in the area.

6.7 该技术的优点/长处/机会

土地使用者眼中的长处/优势/机会
The soil stablizes because of bund plantation

How can they be sustained / enhanced? maintenance and proper management needed.
编制者或其他关键资源人员认为的长处/优势/机会
reduction of slope

How can they be sustained / enhanced? frequent maintenance and avoid free grazing
increase soil depth

How can they be sustained / enhanced? frequent maintenance and avoid free grazing

6.8 技术的弱点/缺点/风险及其克服方法

土地使用者认为的弱点/缺点/风险 如何克服它们?
Loss of land for few years Make bund area productive
编制者或其他关键资源人员认为的弱点/缺点/风险 如何克服它们?
Conflicts discussion and reaching agreements

7. 参考和链接

7.1 信息的方法/来源

7.2 参考可用出版物

标题、作者、年份、ISBN:

monthly, quarterly and annual acheivment report of the woreda

标题、作者、年份、ISBN:

work norm

标题、作者、年份、ISBN:

Soil map: assistance for land use planning and regulatory department.

模块