Hararghie Soil Bund [Ethiopia]
an embankment of soil constructed along the contour to reduce runoff and maintain soil moisture.
- ຜູ້ສັງລວມຂໍ້ມູນ: Unknown User
ສະເພາະຂໍ້ມູນທີ່ປະກາດສູ່ສາທາລະນະຈຶ່ງສາມາດເຫັນໄດ້.
an embankment of soil constructed along the contour to reduce runoff and maintain soil moisture.
Stone faced bund is embankment constructed from stone & soil along the contour at upper part to reduce velocity of run of & length of slope with collection ditch in the uper part.
Gully rehabilitation and hill stabilization with Jatropha hedges.
A waterway is an artficial drainage channel constructed along the steepest slope to receive runoff from cutoff drains and graded structures and drain to the natural waterway safely.
Soil bund and Fanya Juu constructed along the contour lines in microwatershed to conserve soil moisture and control erosion.
It is a structural measure with an embankment of soil or stones or soil and stones, constructed along the contour and stablized with vegetative measures (grass and fodder trees).
Activities that help maintain the productive potentials of soils through prevention and reduction of erosion, enhancing of rehabilitation rate by practicing measures such as microbasins, trench, eyebrow terrace, terraces, pitting and plantation of trees.
It is a structural measure constructed across the slope to control erosion and increase soil moisture.
level bund with double stone walls with soil and grass to stabilize the structure
Rehabilitation of communal grazing lands, through planting of improved grass and fodder trees and land subdivision, to improve fodder and consequently livestock production.