Арга барилууд

Early Warning Message Dissemination [Бангладеш ]

বন্যা পূর্ব-সতর্কবার্তা প্রচার (Bonna Purbo-Satarkabarta Prochar)

approaches_649 - Бангладеш

Бүрэн гүйцэд байдал: 100%

1. Ерөнхий мэдээлэл

1.2 Арга барилыг баримтжуулах болон үнэлгээ хийхэд оролцсон хүн эсвэл байгууллагын холбоо барих хаяг

Мэдээлэл өгсөн хүн(с)

Project staff:

Mustafa Golam

+880 1718770373 / +880 1730799762

pmdrrwash16@gmail.com

Bangladesh Red Crescent Society

Project Manager, DRRWASH Project O⌀ਈce, Shukhsantir Bazar, Dhanghora, Gaibandha, Bangladesh

Бангладеш

Project staff:

Razzak Abdur

+880 1730 799763 / +880 1730 799763

razzak.pe@gmail.com

Bangladesh Red Crescent Society

Project Engineer, DRRWASH Project O⌀ਈce, Shukhsantir Bazar, Dhanghora, Gaibandha, Bangladesh

Бангладеш

Project staff:

Islam Saiful

+880 1730 799746 / +880 1730 799746

saiful644@gmail.com

Bangladesh Red Crescent Society

Field Officer DRR and Training, DRRWASH Project O⌀ਈce, Shukhsantir Bazar, Dhanghora, Gaibandha, Bangladesh

Бангладеш

Арга барилыг баримтжуулах/үнэлэх ажилд дэмжлэг үзүүлсэн төслийн нэр (шаардлагатай бол)
Book project: where people and their land are safer - A Compendium of Good Practices in Disaster Risk Reduction (DRR) (where people and their land are safer)
Арга барилыг баримтжуулах/үнэлэх ажилд дэмжлэг үзүүлсэн байгууллага(ууд)-ын нэр (шаардлагатай бол)
Swiss Red Cross (Swiss Red Cross) - Швейцар

1.3 WOCAT-аар баримтжуулсан өгөгдлийг ашиглахтай холбоотой нөхцөл

Мэдээллийг хэзээ (газар дээр нь) цуглуулсан бэ?

04/10/2016

Эмхэтгэгч болон гол мэдээлэгч хүн(хүмүүс) WOCAT аргачлалаар баримтжуулсан мэдээллийг ашиглахтай холбоотой нөхцлийг хүлээн зөвшөөрсөн.

Тийм

1.4 ГТМ-ийн технологийн асуулгын(д) суурь мэдээлэл(д)

Emergency infrastructure including shelter and linked transport infrastructure
technologies

Emergency infrastructure including shelter and linked transport infrastructure [Бангладеш ]

Emergency infrastructure including shelter and linked transport infrastructure, consists in establishing specific flood shelters (for people and animals) including flood-proof collective water sources and communication infrastructure as well as health and school facilities that may serve at the same time as emergency shelters during floods.

  • Мэдээлэл цуглуулсан: TUHIN SAMADDAR

2. ГТМ Арга барилын тодорхойлолт

2.1 Арга барилын товч тодорхойлолт

An effective system for dissemination of early warning messages was established among the vulnerable communities in Chars (riverine sandy islands) of Gaibandha district, Bangladesh, in order to strengthen their coping mechanisms and reduce loss and damage caused by floods.

2.2 Арга барилын дэлгэрэнгүй тодорхойлолт

Арга барилын дэлгэрэнгүй тодорхойлолт :

Early warning systems are an essential element in building resilience through effective disaster preparedness and risk mitigation: the key characteristics of the approach entail linking the intervention units at community level with national and sub-national early warning systems. It also consists of developing the capacity of the local government institutions and organised communities to not only disseminate early warning but to effectively respond to floods. Merely installing an early warning system is not sufficient to equip communities to cope with recurrent floods; it needs to be linked to broader aspects of disaster preparedness and increased response capacity of communities and local government.
The vulnerability and capacity assessment (VCA) is the basis of all measures oriented at reducing disaster risks. The VCA was carried out with the involvement of local stakeholders, especially the target communities, to understand the vulnerabilities and risks associated with floods as well as to gain insight on existing capacities and capacity gaps that needed to be addressed. The process resulted in a risk reduction action plan which was to be jointly implemented by the target community and local government.
The risk reduction plan pointed to the need of having in place a mix of structural, management and contingency measures. This involved linking local, sub-national and national early warning systems, developing contingency and evacuation plans supported by establishment of safe places where people could move during floods. The risk reduction plan also highlighted the need to support household level protection measures - structurally this meant raising household plinth levels above flood levels. In addition, local early warning system was established through installation of flood markers/pillars, and warning flags at key sites. Capacities were built to internalise, monitor and consequently respond to evolving local flood situation.
Building communication channels that link the local institutions to higher level flood forecasting system resulted in streamlining information from source to destination. The weather forecast communication flow is both vertical and lateral – vertically it is a mix of web-based flood information and mobile telephony which begins at the Flood Forecast Warning Centre (FFWC) - the apex body that monitors flood situation in Bangladesh. FFWC transmits information to the sub-national local governments that have digital centres with trained personnel to access information from FFWC website. Trained entrepreneurs at these digital centres are responsible for monitoring flood forecasts and updating the Union Parishad (the lowest level of local body) and communities on evolving flood situation. By analysing and interpreting relevant information they play a key role in catalysing the early warning system. The local bodies , Union Parishads, use a mix of communication modes - such as miking (public address system), radio and cellular phone - to transfer early warning information to the communities. On the other hand, flood markers are installed locally that are adjusted according to increase in water levels. Designated trained persons – Youth Response Team - take the responsibility to do this. This is monitored by community and the Union Parishad.
In normal times, drills and simulations are conducted by trained team of village volunteers/first responders. They take the lead in organising evacuation and movement to safe places. The government (and project) brings in the logistic support, especially transportation, to facilitate evacuation and movement to safe places.

2.3 Арга барилын зурагууд

Гэрэл зурагтай холбоотой ерөнхий тэмдэглэл:

Approach of Early Warning System in DRRWASH project area in Gaibandha district.

2.4 Арга барилын бичлэгүүд

Тайлбар, товч тодорхойлолт :

Video on Flood 2015 in the DRRWASH project area in Gaibandha including early warning intervention, in Bangla, link:
https://www.youtube.com/watch?v=Os4ZgSMMVyg

Огноо :

25/10/2015

Байршил :

Gaibandha

Зураглаачийн нэр :

Tuhin Samaddar and Vabotosh Karmakar

2.5 Арга барил нэвтрүүлсэн улс орон / бүс нутаг / байршил

Улс :

Бангладеш

Улс/аймаг/сум:

North-Bengal

Байршлын дэлгэрэнгүй тодорхойлолт:

Kamarjani and Mollar Char union in Sadar Upazila and Haldia union in Shaghata Upazila of Gaibandha District

Тайлбар:

The entire intervention area is divided into 261 clusters. In each cluster, one local volunteer (YRT) has been nominated for preparedness and response operation. 30 Village Disaster Management Committee (VDMC) are actively monitoring the process under the guidance of three Union Disaster Management Committee (UDMC).

2.6 Арга барилыг эхлэх, дуусах огноо

Эхлэх жилийг тэмдэглэ:

2013

Хэрэв арга барилыг хэрэгжүүлэх жил тодорхойгүй бол ойролцоогоор эхлэх огноог зааж өгнө үү :

<10 жилийн өмнө (саяхны)

2.7 Арга барилын төрөл

  • төсөл / хөтөлбөр дээр үндэслэсэн

2.8 Арга барилын үндсэн зорилго, зорилтууд

To promote resilient communities through improved flood preparedness that reduces loss and damage of vulnerable people's lives and protects their livelihoods in the chars of Gaibandha district.

2.9 Арга барилын хүрээнд хэрэгжсэн Технологи/Технологиудад дэмжсэн эсвэл саад учруулсан нөхцлүүд

нийгэм / соёл / шашны хэм хэмжээ, үнэт зүйлс
  • Идэвхижүүлэх

The intervention built upon traditional coping mechanisms and indigenous systems of disaster risk management. The blending of the traditional and indigenous practices with contemporary knowledge and preparedness practices acted as drivers in terms of choice and adoption of technologies.

  • Хазаарлалт

In earlier phases of the intervention, the cultural norm of not abandoning one's household even in extreme crisis hindered timely access to emergency infrastructure.

санхүүгийн нөөц, үйлчилгээний хүртээмж / боломж
  • Идэвхижүүлэх

The DRR intervention facilitated leveraging of institutional financial resources (Local government budget) and secured cost contribution from target communities.

  • Хазаарлалт

Lack of adequate capacities and resources with local government.

Бүтэц зохион байгуулалт
  • Идэвхижүүлэх

The Disaster Management Act and Standing Orders on Disaster of the Govt. of Bangladesh provides for a decentralised disaster management institutional setting from the central level to the local level.

  • Хазаарлалт

In principle a decentralised disaster management structure is in place but due to operational and financial constraints they are unable to perform their mandated function.

талуудыг хамтын ажиллагаа/зохицуулалт
  • Идэвхижүүлэх

The initiative built a good coordination with state actors at various levels. From time to time it was also able to secure collaboration from non-state actors around specific thematic areas such as obtaining livelihood support in non-farm sector, synergising disaster risk management work, ensuring access of vulnerable communities to social protection measures.

  • Хазаарлалт

Harmonisation of disaster centred initiatives is a time consuming process and very often does not lead to collaborations that harness existing synergies.

Хууль, эрхзүйн хүрээ (газар эзэмшил, газар, ус ашиглах эрх)
  • Идэвхижүүлэх

Disaster Management Act, 2012 provides the legal framework for disaster risk management in Bangladesh.

Бодлогууд
  • Идэвхижүүлэх

A set of policies supports the Disaster Management Act. Government's standing orders on disaster clearly defines the roles and responsibilities of various ministries, line agencies, local govt., mandated committees and other non-state actors in disaster risk management.

  • Хазаарлалт

Policy enforcement across sectors remains weak in Bangladesh.

Газрын засаглал (шийдвэр гаргах, хэрэгжүүлэх, шаардлага)
  • Идэвхижүүлэх

Traditional rights to land are still accepted in Chars of Bangladesh .

  • Хазаарлалт

Land ownership is complex in Chars given its unstable nature due to high vulnerability to river erosion. Char lands are controlled by the local elites, often residing in the mainland, who use their political influence to secure govt. collusion/indifference (though char lands officially belong to them) in exercising land ownership and land transactions. Eventually it is the elites who lease and/or rent out land to the char population.

ГТМ-ийн талаарх мэдлэг, техникийн дэмжлэг авах боломж
  • Идэвхижүүлэх

Timely weather forecast allows communities to accordingly time their agricultural operation, especially the sowing operations

  • Хазаарлалт

River erosion threats strongly disincentivise investment in SLM.

зах зээл (материал худалдан авах, бүтээгдэхүүн борлуулах), үнэ
  • Хазаарлалт

Market forces are yet to develop properly in Chars which are by nature isolated geographical units, accessed only through time consuming and expensive transportation means.

ажлын багтаамж, хүн хүчний нөөц бололцоо
  • Идэвхижүүлэх

Higher productivity of land in Chars allow for lower labour engagement in agriculture.

  • Хазаарлалт

Disaster and higher profitability in mainland drives migration leading to labour shortages.

3. Оролцогч талуудын оролцоо ба үүргүүд

3.1 Арга барилд оролцогч талууд болон тэдгээрийн үүргүүд

  • олон нийтэд түшиглэсэн байгууллагууд

Village Disaster Management Committee (VDMC)

The VDMC is the key actor to perform disaster risk reduction activities in the communities. The covers supporting the conduct of VCA, conducted by external facilitators, by extending logistic support and securing representative participation of larger community (non-VDMC members) in the VCA process. The VCA helps VDMCs develop their action plans. The operationalisation of the plans is anchored in the VDMC and so is leveraging cooperation and collaboration from local government. The VDMC also acts as first responder and as custodian responsible for operation and maintenance of built emergency and health infrastructure. Assessing community needs, beneficiary selection, contribution collection and financial management of hardware are their other key responsibilities.
Contribution collection means mediating and collecting the contribution of users/ beneficiaries and local governments to the costs of the built facilities (plinth raising, WASH, flood shelters, etc.) in pre-agreed proportion.
Financial management of hardware refers to VDMCs engaging in all aspects of the construction process of small scale communal and household mitigation options (flood shelters, roads, bridges, household plinth raising, etc. ) and shouldering financial management responsibilities related to their construction and subsequent operation and maintenance. This involves managing finances (contribution from users/LGI/project); giving work contract and settlement of payment following work completion.

  • Багш/ сурагч/ оюутан

Youth Response Team (YRT) members

YRT has been developed to promote volunteerism. Their main role is to support response and recovery operations during and after disaster. They are especially trained in Search & Rescue. As they are located in the community, YRTs actively engage in early warning dissemination. They act as focal person for monitoring and adjusting the flood markers. They support the Union Parishad in transmitting early warning to communities (as mentioned above) and supporting the evacuation of communities to safe places.

  • Хувийн хэвшил

Enterpreneur of Union Digital Center

The lowest level of local government, the Union Parishad (UP), has a Digital Center to render ICT services to communities. These are run by local entrepreneurs. The entrepreneurs are responsible for monitoring flood forecasts on the internet and updating the Union Parishad (UP) and community-based organisations (CBOs) on evolving flood situation. By analysing and interpreting relevant information they play a key role in catalysing the early warning system.

  • Орон нутгийн захиргаа

Union Disaster Management Committee (UDMC)

The UDMC disseminates forecasts, warnings, and advisories locally. It also performs a lead role in response and recovery operations.

Хэрэв хэд хэдэн оролцогч талууд оролцсон бол голлох төлөөлөгчийг зааж өгнө үү:

UDMC

3.2 Арга барилын янз бүрийн үе шатанд орон нутгийн газар ашиглагчид / бүлэглэлүүдийг татан оролцуулах
Орон нутгийн газар ашиглагч / орон нутгийн иргэдийн оролцоо Хэн оролцсоныг тодорхойлж, үйл ажиллагааг тайлбарлана уу
санаачлага/идэвхжүүлэлт интерактив Key Actors: VDMC/CBOs and Local Government Institutions (UDMC) Activities : formation of CBOs, reformation of UDMC, VCA and volunteer selection
Төлөвлөгөө интерактив Key Actors: VDMC/CBOs and Local Government Activities: preparation of risk reduction action plan, preparation of evacuation plan along with map of evacuation routes (route to be taken for the evacuation in moving to safe places), contingency plan development, planning of emergency and health infrastructure, Early Warning Systems (EWS) planning
Хэрэгжилт интерактив Key Actors: VDMC/CBOs and Local Government Activities: Establish Early Warning System, emergency infrastructure, access infrastructure (wooden bridge, roads, etc.), household infrastructure
Мониторинг/ үнэлгээ өөрийн хүчийг нэгтгэсэн Key Actors: VDMC/CBOs, Local and Sub-national Government Activities: Developing Quality Assurance System, Community Review Meeting, Site visits/physical verification, quality and financial audit, survey and spot checks,
Initiation өөрийн хүчийг нэгтгэсэн Ket Actors: VDMC/CBOs, Local Government and Private Sector: Activities: O&M of built infrastructure and Sanitation Marketing which involves supporting local entrepreneurs to establish local supply chains of toilet building materials through their own investment and build toilets for users that bear the costs. The project does not build latrines directly but rather mediates the linkages of users with the sanitation entrepreneurs

3.3 Диаграм (хэрэв боломжтой бол)

Тодорхойлолт :

The flow chart explains application of the EWS and clarifies local linkages with national flood forecasting and warning centre (FFWC)

Зохиогч :

Tuhin Samaddar

3.4 ГТМ-ийн технологи/технологиуд сонгох шийдвэр

Хэрэгжүүлэх Технологи/Технологиудын сонголтыг хийж шийдвэр гаргасан хүнийг тодорхойлно уу:
  • оролцооны зарчмын хэсэг болох бүх холбогдох талууд
Тайлбар :

Since participatory approach has been adopted to examine vulnerabilities and capacities, the approach and technology choice to address risk and vulnerabilities was collectively decided.

Шийдвэрийг юунд үндэслэн гаргасан:
  • Судалгааны үр дүн, ололтууд
  • Хувь хүний туршлага ба санал бодол (баримтжуулаагүй)
  • Government policies and mandates

4. Техникийн дэмжлэг, чадавхи бүрдүүлэх, мэдлэгийн менежмент

4.1 Чадавхи бэхжүүлэх/сургалт

Газар эзэмшигчид / бусад оролцогч талуудад сургалт явуулсан уу?

Тийм

Хэн сургалтанд хамрагдсан бэ:
  • Газар ашиглагчид
  • хээрийн ажилтан / зөвлөх
  • Anser-VDP (Village Defence Party) member
Сургалтын хэлбэр :
  • үзүүлэнгийн талбай
  • Олон нийтийн уулзалт
  • курс дамжаа
Хамрагдсан сэвдүүд:

Several training courses and workshops were organised on disaster preparedness and response:
1. Early Warning System (for UDMC/VDMC/ Anser-VDP/YRT/VCRP/Staff): Disaster context in Bangladesh, techniques to identify water levels against standardised danger levels, determining flood intensity by observing pillars and flags, dissemination strategies for early warning messages among the community, and role of stakeholders to warning message dissemination.
2. Evacuation Plan (for VDMC/YRT/VCRP): Response operation, preparing checklist for response, preparing risk and resource map, information collection and analysis, preparing evacuation route maps, and roles and responsibilities of respective stakeholders in effectuating evacuation plan
3. Response Plan (for UDMC): Importance of response plan, key constituents of preparedness and response, interpretation of Early Warning information from FFWC, creating contingency fund, search and rescue, emergency relief and first aid, identifying safe exit route and transportation, damage assessment, launching control room, involving existing manpower and resources in the community and other organisation, and prepositioning of rescue equipments.

Тайлбар:

609 VDMC/UDMC members were trained on various DRR topics. 255 local youth volunteers (YRT/VCRP) were also trained on early warning message dissemination, flood forecast interpretation, preparing evacuation plan and route map.
4 mock drill demonstration events were conducted by local government in which 276 community members participated. Refresher training was also organised for newly elected union parishad members on their broad mandate with specific reference to their roles and responsibilities in disaster risk management.

4.2 Зөвлөх үйлчилгээ

Газар ашиглагчдад зөвлөх үйлчилгээ авах боломжтой байдаг уу?

Тийм

4.3 Институцийг бэхжүүлэх (байгууллагын хөгжил)

Арга барилаар дамжуулан институц байгуулагдаж эсвэл бэхжсэн үү?
  • Тийм, маш их
Байгууллагууд бэхжиж, үүсэн бий болсон түвшин(үүд)-г тодорхойлно уу:
  • Орон нутгийн
  • Бүс нутгийн
Байгууллага, үүрэг, хариуцлага, гишүүд гэх мэтийг тайлбарлах:

CBOs/Village Disaster Management Committee (VDMC)- on an average each CBO/VDMC has 17 members. Their roles and responsibilities entail assessments, beneficiary selection, developing and implementing Risk Reduction Action Plans (RRAPs) with special focus on disaster preparedness and response. A key function entails their engagement in Early Warning Systems (EWS) and planning and implementation of emergency and health infrastructure, shelter protection, and creating access infrastructure. Operation and Management of all built assets and infrastructure is their responsibility.

Local Government/UDMC: on average it has a 36 members. Standing orders on disaster of the government defines their roles and responsibilities which covers the entire gamut of functions associated with disaster risk management at the local level. Strengthening preparedness and leading effective response is critical to their mandate.

Дэмжлэгийн төрлийг ялга:
  • чадавхи бэхжүүлэх / сургалт
  • Тоног төхөөрөмж
Дэлгэрэнгүй мэдээллийг өгнө үү:

Megaphone, stretcher, Lifejacket, Lifebuoy, Torchlight, Raincoat, Gumboot, Rope and First aid box are some of the equipments that have been given to target communities. Further, the YRTs have received whistle, umbrella and apron for early response operation

4.4 Мониторинг ба үнэлгээ

Мониторинг болон үнэлгээ нь арга барилын хэсэг үү?

Тийм

Тайлбар:

A joint monitoring team has been formed comprising representative of CBOs, local government and project staff.

Хэрэв тийм бол энэ баримт бичиг нь мониторинг, үнэлгээнд ашиглагдахаар зориулагдсан уу?

Үгүй

4.5 Судалгаа

Судалгаа арга барилын хэсэг нь байсан уу?

Үгүй

5. Санхүүгийн болон гадаад материаллаг дэмжлэг

5.1 ГТМ-ийн Арга барилын бүрэлдэхүүн хэсгийн жилийн төсөв

Арга барил дахь ГТМ-ийн бүрэлдэхүүн хэсгийн жилийн төсвийг ам.доллараар харуулна уу:

10384.00

Хэрэв жилийн төсөв тодорхойгүй бол хягаарыг тодруулна уу:
  • 10,000-100,000
Тайлбар (жнь: санхүүжилтийн гол эх үүсвэр / гол хандивлагчид):

Swiss Red Cross

Above mentioned amount is for the Early Warning System Implementation approach only

5.2 Газар ашиглагчдад санхүүгийн / материаллаг дэмжлэг үзүүлсэн

Технологи / технологийг хэрэгжүүлэхэд газар ашиглагчид санхүүгийн / материаллаг дэмжлэг авсан уу?

Тийм

5.3 Тодорхой зардлыг даахад чиглэсэн дэмжлэгт (хөдөлмөрийн хүчийг оролцуулаад)

  • үгүй
 
Хэрэв газар ашиглагчийн хөдөлмөрийн хүч чухал байсан бол энэ нь аль хэлбэр байсан:
  • сайн дурын
Тайлбар:

All actions related to dissemination of early warning were performed on a voluntary basis.

5.4 Кредит

Арга барилын хүрээнд ГТМ-ийн үйл ажиллагаанд зориулж зээлд хамрагдсан уу?

Үгүй

5.5 Бусад урамшуулал, хэрэгсэл

ГТМ-ийн технологийг хэрэгжилтийг дэмжихэд ашигласан бусад урамшуулал, хэрэгсэл байсан уу?

Үгүй

6. Нөлөөллийн дүн шинжилгээ ба дүгнэлт

6.1 Арга барилын нөлөөллүүд

Арга барил нь орон нутгийн газар ашиглагчдыг чадваржуулах, оролцогч талуудын оролцоог сайжруулсан уу?
  • Үгүй
  • Тийм, бага зэрэг
  • Тийм, зарим
  • Тийм, их

The participation of all local stakeholders, especially women, has improved considerably.

Арга барил нь нотолгоонд суурилсан шийдвэр гаргах боломж олгосон уу?
  • Үгүй
  • Тийм, бага зэрэг
  • Тийм, зарим
  • Тийм, их

The decision making especially with regard to effectiveness and quality of approach and technologies has been determined by the evidence on the ground.

Арга барил нь ГТМ-ийн технологийг хэрэгжүүлж, хадгалахад газар ашиглагчдад тусласан уу?
  • Үгүй
  • Тийм, бага зэрэг
  • Тийм, зарим
  • Тийм, их

Since the implementation of technologies and maintenance of built infrastructure has been largely user led, it has improved their capacity to do the same.

Арга барил нь ГТМ-ийн хэрэгжилтийн санхүүгийн эх үүсвэрийн хүртээмжийг сайжруулах / эргэлтэнд оруулахад чиглэсэн үү?
  • Үгүй
  • Тийм, бага зэрэг
  • Тийм, зарим
  • Тийм, их

User contribution and govt. contribution was a mandatory component of the project which led to mobilisation of resources that supplemented project resources.

Энэ арга барил бусад сонирхогч талуудын мэдлэг, чадавхийг сайжруулсан уу?
  • Үгүй
  • Тийм, бага зэрэг
  • Тийм, зарим
  • Тийм, их

Implementation of well designed capacity building plan cognizant of the needs of diverse stakeholders has improved the knowledge and capacities of relevant stakeholders.

Арга барил нь оролцогч талуудын хооронд институци, хамтын ажиллагааг бий болгож, бэхжүүлсэн үү?
  • Үгүй
  • Тийм, бага зэрэг
  • Тийм, зарим
  • Тийм, их

the central element of the approach has been to ensure sustainability of benefits which cannot be attained without strong institutions collaborating around disaster risk management work. Thus, the approach led to improved collaboration between stakeholders and strengthened institutions.

Энэ арга барил зөрчилдөөнийг багасгасан уу?
  • Үгүй
  • Тийм, бага зэрэг
  • Тийм, зарим
  • Тийм, их

The approach is based on conflict sensitive programme management. This allowed for pro-active identification of conflicts and tensions followed by measures aimed at their mitigation.

Арга барил нь эмзэг бүлгийнхнийг нийгэм, эдийн засгийн хувьд чадавхижуулсан уу?
  • Үгүй
  • Тийм, бага зэрэг
  • Тийм, зарим
  • Тийм, их

The extreme poor and socially disadvantaged were especially targeted by the disaster preparedness approach

Арга барил нь жендэрийн тэгш байдлыг сайжруулж, эмэгтэйчүүд, охидыг чадавхжуулсан уу?
  • Үгүй
  • Тийм, бага зэрэг
  • Тийм, зарим
  • Тийм, их

Though significant improvements are there as women and girls are much more aware about disaster preparedness in general and flood response in particular, there remains room for further improvement.

Арга барил нь ус, ариун цэврийн байгууламжийн хүртээмжийг сайжруулахад хүргэсэн үү?
  • Үгүй
  • Тийм, бага зэрэг
  • Тийм, зарим
  • Тийм, их

As part of strengthening preparedness to health hazards, water and sanitation infrastructure set up by the project has greatly improved access to water and sanitation

Арга барил нь газар ашиглагчид уур амьсгалын өөрчлөлтөд дасан зохицох чадварыг дээшлүүлж, уур амьсгалын өөрчлөлттэй холбоотой гамшгийг бууруулах чадавхийг сайжруулсан уу?
  • Үгүй
  • Тийм, бага зэрэг
  • Тийм, зарим
  • Тийм, их

Strengthened DRM capacities include improved climate adaptation and capacities to mitigate climate induced disasters.

6.2 ГТМ-ийг хэрэгжүүлэх газар ашиглагчидын гол санаачилга

  • Гамшигийн эрсдэл буурсан

Early warning system helps people prepare and act before the water level crosses danger level (which denotes the settlement is at risk of inundation)

6.3 Арга барилын үйл ажиллагааны тогтвортой байдал

Газар ашиглагчид арга барилаар дамжуулан хэрэгжүүлсэн арга хэмжээг тогтвортой хадгалж чадах уу (гадны дэмжлэггүйгээр)?
  • Тийм
Хэрэв тийм бол яаж гэдгийг тайлбарлана уу:

Union Digital Center is an information hub that exists in the union where people have easy access. The technology is simple and the approach is easy to understand and has already benefited the targeted community. The anchoring of preparedness in general and Early Warning Systems (EWS) in particular in local government and its rolling out in collaboration with communities imparts high probability of sustainability to disaster preparedness measures. During the project cycle, two flood events of significant magnitude have tested the approach and technology and resulted in tangible benefits for the community. At the same time since sustainability considerations are inbuilt in project design and have guided the implementation of the approach and technology, the likelihood of their sustainability is very strong.

6.4 Арга барилын тогтвортой/давуу тал/боломжууд

Газар ашиглагчдын тодорхойлсон давуу тал/боломжууд
A trained group of volunteer is available in the community
Response equipments are in place and ready to use if and when needed
Early Warning System facilitates people's timely access and movement to appropriate emergency infrastructure and protected shelters
Rapid evacuation, especially for physically challenged, children and elderly people, and cattle
Crops are saved due to timely action related to sowing and harvesting
Means of preparedness, such as boat, banana raft, portable cooker, firewood, oral rehydration solution, dry food can be collected beforehand
Balanced representation of community in governmentt mandated disaster committees
Coordination/ communication with development actors and local government/union parishad is more forthcoming
Эмхэтгэгч, бусад мэдээлэл өгсөн хүмүүсийн өнцгөөс тодорхойлсон давуу тал/боломжууд
Sustainability dimensions have been well considered and applied in adopted approach and technologies
Strengthened community institutions are in place to address disaster risk Management issues, especially those related preparedness and response mechanisms
Community and local government interface has been strengthened to devise appropriate disaster Management solutions
Decisions on preparedness approach and attendant technologies are taken collectively by stakeholders
A replicable model of early warning systems, emergency and access infrastructure has been established

6.5 Арга барилын дутагдалтай/сул тал/аюул болон тэдгээрийн хэрхэн даван туулах арга замууд

Газар ашиглагч нарын тодорхойлсон сул тал/ дутагдал/ эрсдэл Тэдгээрийг хэрхэн даван туулах вэ?
Long term maintenance of response equipments UDMC should play custodian's role; local people should contribute towards recurrent cost
Эмхэтгэгч, бусад мэдээлэл өгсөн хүмүүсийн өнцгөөс тодорхойлсон сул тал/ дутагдал/ эрсдэл Тэдгээрийг хэрхэн даван туулах вэ?
Replicability of the model might be difficult due to lack of funds and functionaries available with local government Support local government in negotiating more resources from higher levels of governance and Administration; build capacity of local government to utilise resources efficiently and effectively

7. Суурь мэдээлэл болон холбоосууд

7.1 Мэдээллийн эх үүсвэр/аргууд

  • Газар ашиглагчтай хийсэн ярилцлага

15 Key Informant Interview (KII)
2 Focus Group Discussion (FGD)

  • ГТМ-ийн мэргэжилтэн/шинжээчтэй хийсэн ярилцлага

4

  • тайлан болон бусад эх сурвалжийн бүрдэл

6

7.2 Холбогдох бүтээлийн ишлэл

Гарчиг, зохиогч, он, ISBN:

Three VCA Reports published by UDMC with support of DRRWASH project

Хаанаас авч болох вэ? Зардал?

Bangladesh Red Crescent Society

7.3 Холбогдох мэдээллийн интернет дэх нээлттэй холбоосууд

Гарчиг/ тодорхойлолт :

Flood Forecasting & Warning Centre (FFWC), Bangladesh Water Development Board (BWDB), SOD

URL:

http://www.ffwc.gov.bd/#, http://ddm.portal.gov.bd/sites/default/files/files/ddm.portal.gov.bd/page/a3f4cc27_7f7d_4c2b_a1b0_166fe6bef73b/udmc.pdf

Модулууд